Equipping of Existing Substations and LV Distribution Network Expansion/Reinforcement Work in Eastern Region

  • Start Date: 03 January 2017
  • End Date: 24 January 2017
  • Client: Abu Dhabi Distribution Company (ADDC)
  • Main Contractor: EMC Electromechanical Co LLC
  • Consultant: Parson Brinkerhoff
  • featured
  • featured
  • featured
  • featured
  • featured
  • featured
  • featured
  • featured
  • featured

Scope of Work

Abu Dhabi – Eastern Region is one of the fastest developing areas in Abu Dhabi Emirate. In order to cater for the significant load growth resulting from the various new development projects, Abu Dhabi Distribution Company (ADDC) has taken up a comprehensive program for the reinforcement and expansion of distribution networks to ensure a reliable electrical network with sufficient capacity.

  • Transport to site, installation, testing and commissioning of 11 kV Indoor Switchgear Panel of 1250 Amps Busbar and 25kA Short Circuit rating for 1 sec. with 12 Cable Feeders and 1 Bus Coupler/Riser including Control and Protection CT's and VT's.

  • Collection from ADDC stores, transport to site, installation, testing and commissioning of 11 kV SF6 Gas-Insulated Ring Main Unit TRM (Type-1) or QRM (Type-2) with integrated marshalling cubicle (free issue).

  • Supply, installation, testing and commissioning of 48 V DC single configuration system consisting of 48 V DC Battery Banks, 48 V DC dual configuration Battery Chargers and DC DB suitable to feed all required DC loads in switching stations.

  • Collection from ADDC stores, transport to site, installation, testing and commissioning of new and complete 11/0.415 kV Package Unit Substations (PU) of 1500 kVA, 1000kVA or 500kVA (free issue).

  • Collection from ADDC stores, transport to site, installation, testing and commissioning of 11/0.415 KV, 1500 kVA Distribution Transformers (oil insulated type) with neutral CT (free issue).

  • Collection from ADDC stores, transport to site, installation, testing and commissioning of 11/0.415 kV, 1000/500 kVA Distribution Transformers (oil insulated type) (free issue) in outdoor locations.

  • Design, supply and installation of a complete earthing system for the Substation and Switching Station and carry out ground resis-tivity and aggressiveness of soil measurements of the whole substation plot.

  • Collection from ADDC stores, transport to site, installation, testing and commissioning of LV 5 Panel Distribution Boards with SBEF Relay, Metering CTs on all outgoing feeders and provision for Diesel Generator connection facility (free issue).

  • Collection, transport to site, installation, testing and commissioning 11 kV, 3core 300 sq.mm. and 3core 240 sq.mm. Cu XLPE ca-bles, termination and jointing kits (free issue) from ADDC stores.

  • Supply, installation, testing and commissioning of DMS Marshalling panel, including configuration and parameterization at DMS.

  • Testing & Commissioning of cables, 11kV switchgear, 1500/1000/500 kVA transformers, QRM, TRM, 1500/1000 kVA Package unit.

Other Projects

RFX:4351300014, CE/0...

Installation Testing & Commissionin...

Read More
Installation Testing & Commissioning of Distribution SS & Kiosk and Disconnection Recovery Re-placement of Equipment.

DEWA CONTRACT RFX:4351300015, CE-0...

Installation of 11 KV Overhead on Wooden...

Read More
Installation of 11 KV Overhead on Wooden Poles & Dismantling & recovery of existing 33KV/ 11KV overhead lines.

Contract No ADDC Contract: D-120...

Load Transfer to new 132/11KV Primaries...

Read More
Load Transfer to new 132/11KV  Primaries E40 and W41 IN Abu Dhabi Island

CONTRACT NO: TRANSCO Contract: N-...

400kV Cabling Works between Sas Al Nakhe...

Read More
400kV Cabling Works between Sas Al Nakheel, Mahawi and Musaffah.