Survey works, demarcation, Co-ordination, obtain NOC and approval works with DEWA and other local authorities. Site facilities, Mobilization and Demobilization. Excavation and backfilling for the trial pits/trenches to identify services as per DEWA requirements and local authorities specifications. Civil Works : Manual Excavation & Backfilling for cable trench to expose and slew the existing 6.6/11 KV cables in normal soil as per DEWA standards, cable installation guidelines and local authority specifications. Excavation around construction area. Electrical Work : Arrange to relocate and later protect the 6.6/11KV cable in wooden box in construction area only. Preparation & Submission of ASBUILD drawing to DEWA/Client for final clearance.