“List of Activities for the mentioned Project:
1) Utility Relocation & Protection Works Route Survey and necessary trial pits, Utility NOC’s, Utility services drawings, DEWA approved layout plan and single line diagram, DEWA free issue materials, cables, tiles, tape, jointing materials and UPVC ducts . Preparation of shop drawings / As Built drawings All civil works for excavation , backfilling and reinstantement of interlock tiles, asphalt parking and Asphalted Roads Removal of surplus excavated materials , Interlock tiles and ashalt. Transportation of cable drum and other free issue from DEWA stores to site. Transportation of balance cables, empty cable drums and other materials to DEWA stores.Reconciliation of issued and used quantities. Provision of cable winch, cable rollers, cable trailor and other related materials for cable laying / reovery / jointing. Cable termination / Jointing works, Testing of DEWA cables after installation(Megger 5KV)”