Supply and Installation of UPVC duct 150mm to DEWA Requirement – 12 Way x 6 Meter Supply and Installation of UPVC duct 150mm to DEWA Requirement – 2 Way x 16 Meter
Equipping of Existing Substations and LV...
Installation Testing & Commissionin...
Installation of 11 KV Overhead on Wooden...
Load Transfer to new 132/11KV Primaries...
400kV Cabling Works between Sas Al Nakhe...