Scope of works for this project has been detailed as below:
Transport to site 11 KV Intermediate wooden pole with cross arms (Including earth wire components and other hardware) insula-tors, pre-cast concrete foundation (*) and assemble the pole.
Excavated pole pit, erect Intermediate wooden pole complete with X-arms, insulators and pre-cast concrete foundation.
Transport to site 11 KV Angle wooden poles(60° deviation or 90° deviation as per site requirement) complete with X-arms (Including earth wire components and other hardware) insulators, stay sets ,pre-cast concrete foundation (*) and assemble the pole.
Excavated pole pit, erect angle wooden poles complete with X-arms, insulators and pre-cast concrete fountation. Backfill compact and re -instate (if applicable) to original state.
Transport to site stay rods complete with staywire, stay insulator ,Guy grips, pole top make off, concrete block etc.for stay, exca-vated stay pit, set stays, make off stay wire and backfill.
Transportation and Installation of AAA conductors to site ,runout, sag & complete including jumpering (Three phase conductors and one earth conductors)
Transport and Installation to site H pole wooden structure with transformer mounting platform, excavate structure pit and erect the structure with pre-cast concrete foundation.
Transport to site 100 KVA pole mounting transformer, lighting arrestors and install it on pole mounting structure and make H.T connection.
Excavate earth pit/pits install copper earth rod/rods and other accessories & terminate earth conductor on sectional/Terminal poles, pole structure and PMT.