RFX:4351300014, CE/0802/2009 , CE-0345B/2007

Installation Testing & Commissioning of Distribution SS & Kiosk and Disconnection Recovery Re-placement of Equipment.

  • Client: Dubai Electricity & Water Authority (DEWA)
  • Main Contractor: EMC Electromechanical Co LLC
  • Consultant: NOT APPLICABLE
  • featured
  • featured
  • featured
  • featured
  • featured
  • featured
  • featured
  • featured

Scope of Work

Scope is briefly detailed as below:

  • Transportation, Installation, testing and commissioning of 1000/500 kVA Pocket Substation (assembled unit of Transformer, LVDB and RMU) with/without LV Meter.

  • Transportation, Installation, testing and commissioning of 1500/1000 kVA Transformers.

  • Transportation, Installation, testing and commissioning of 3/4 Function Ring Main Units (RMU).

  • Transportation, Installation, testing and commissioning of 8/12 Way Cubicle type LVAC Boards.

  • Transportation & Installation of Standard Kiosks/ Extra Large Kiosks.

  • Transportation & Installation of Cables - LV/HV.

  • Jointing/Termination of 11kV 3C x 300/240 mm2 Cables.

  • Transportation & Installation of Earthing Materials (Sub-station / Pockets)

  • Earthing Works – Internal & External for Pocket & Substations.

  • Recover of Pocket Substations, Transformers (1500, 1000, 500 kVA) as per DEWA standards and specification.

  • Testing & Commissioning of Pockets/Sub-stations.

Other Projects

CONTRACT NO: D-101856

Equipping of Existing Substations and LV...

Read More
Equipping of Existing Substations and LV Distribution Network Expansion/Reinforcement Work in Eastern Region

DEWA CONTRACT RFX:4351300015, CE-0...

Installation of 11 KV Overhead on Wooden...

Read More
Installation of 11 KV Overhead on Wooden Poles & Dismantling & recovery of existing 33KV/ 11KV overhead lines.

Contract No ADDC Contract: D-120...

Load Transfer to new 132/11KV Primaries...

Read More
Load Transfer to new 132/11KV  Primaries E40 and W41 IN Abu Dhabi Island

CONTRACT NO: TRANSCO Contract: N-...

400kV Cabling Works between Sas Al Nakhe...

Read More
400kV Cabling Works between Sas Al Nakheel, Mahawi and Musaffah.